The optimization AI for data centers.
Every watt · every litre · every degree.
Most halls run colder than they need to, just in case. Parity finds the most efficient setting for every unit that stays inside your limits, around the clock, and shows you why.
Cold air
Four indirect evaporative coolers push air into the hall. Parity tracks the electricity and water each one uses.
Racks
Parity estimates the inlet temperature of all 48 racks. The limit is 27 °C, and even the hottest rack should stay at least 1 °C below it.
Hot aisle
Air leaving the racks collects in the contained aisle and returns to the coolers through the ceiling. The warmer that return air, the less the coolers have to work.
Move the supply air temperature
Outdoor 34 °C · 20% RH · 15:00
- Cooling power
- 26.3 kW
- Water
- 0.29 m³/h
- Hottest rack inlet
- 22.0 °C
All rack inlets are inside the limit.
Data centers pay for cold they don't need
ASHRAE recommends rack inlet temperatures between 18 and 27 °C. Many operators sit near the bottom of that range because nobody can see what a warmer setting would do.
Cooling is one of the largest energy costs in a data center. Weather, load and equipment change hour by hour, so a fixed setting usually costs more than it needs to.
Faults are quiet too. A unit that starts to wear out raises no alarm; it simply uses more electricity and water. The identical unit beside it runs normally, and the reason for the difference stays hidden in the BMS.
What Parity does
Runs on the BMS data your site already has. No extra sensors, no cloud connection.

Finds faults nobody sees
Compares identical units with each other and with the twin, then says why one of them behaves differently and what a technician should check first.
Optimizes around the clock, inside limits
Picks supply and return setpoints for the weather and load right now, checks every candidate against the twin first, and keeps a safety margin.
Balances water and electricity
Weighs electricity tariffs, water price and your water targets to decide, unit by unit, between dry, evaporative and compressor modes.
Answers “why?” with data
Operators can ask the copilot why a decision was made. The answer comes from the twin, the site history and the measurements.
How it works
Build the twin
A physical model of your halls: airflow, pressure, humidity and every cooler.
Fit it to your site
With read-only data from the BMS, the twin learns to behave like your hall.
Decide with a look ahead
A neural network proposes settings, and the twin tests them against the coming weather and tariffs.
Advise first
Parity starts by recommending. Operators approve, and Parity learns from what they accept.
Close the loop when you're ready
Parity moves from limited to full control and always stays inside the limits operators set.
Parity in two minutes
Read the transcript
Every second, the internet turns electricity into heat.
This machine fights it with water and air.
Most of the year, no compressor. Just physics.
Data centers run them as twins.
Same model. Same air. Same job.
One of them... changes.
No alarm. Nothing breaks.
On every screen, everything looks fine.
It just quietly burns three times the energy.
For months.
Parity's AI compares every twin against physics,
and tells you why.
But the biggest waste isn't broken.
Data centers run cold. Just in case.
Inside the safe range, nobody touches a thing.
Parity's AI does.
Every unit. Every hour. Every degree.
It never sleeps.
Water or electricity? The cheapest way to stay cool changes every hour.
Parity weighs tariffs, weather and your water targets, then picks the mode.
And it works with you.
It suggests. You approve.
Ask it why, and it answers with data.
Every decision teaches it your site.
Parity. The optimization AI for data centers.
What we are aiming for
We run Parity in full control in our digital twin, on facilities it has never seen and across every season. The results so far are in line with these goals.
- the cooling energy saving we are aiming for
- 15–20%
- minutes with a rack inlet above the limit
- 0
- safe settings even with one cooler off
- N-1
- new decisions as weather and load change
- 24/7
Our first pilot will measure these goals at a real facility.
Team

Emre Kurt
Founder
Data center operations engineer and final-year electrical and electronics engineering student at Gazi University. Built Parity's twin, diagnosis and decision engines, and the console.
Emre Kurt on LinkedIn
Emirhan Çoban
Co-founder
International relations student at Ankara Hacı Bayram Veli University. Handles support programs, regulation, and investor and customer relations.
Request a pilot
We're looking for a first data center to run Parity in advice mode on historical data. The first step needs no live connection: from a few months of BMS logs, we prepare a report that shows which units use more than they should, why, and where you can save safely. Tell us about your site.